page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
page 40
page 41
page 42
page 43
page 44
page 45
page 46
page 47
page 48
page 49
page 50
page 51
page 52
page 53
page 54
page 55 page 56
page 57
page 58
page 59
page 60
page 61
page 62
page 63
page 64
page 65
page 66
page 67
page 68
page 69
page 70
page 71
page 72
page 73
page 74
page 75
page 76
page 77
page 78
page 79
page 80
page 81
< prev - next > Energy Biogas Biogas Digest Vol 2 (Printable PDF)
The proper dimensioning of an internal heating system seems to be more difficult because of
the different currents due to pumping, agitation, thermo-convection and the inflow of bio-
mass.
Under-floor heating systems have been very popular, as they have no disturbing parts in the
digester itself. Due to sedimentation and the resulting worsening of heat transportation into
the digester, under-floor heating is no longer recommended. With the growth of digester
volumes and the need of bigger heating systems, it is also more difficult to build under-floor
heating big enough to provide the necessary heat.
Heating coils installed at the inner wall of the digester are a rather new practice. Heating coils
made out of steel are much more expensive than heating coils out of plastic material (PE).
Materials developed during the last years make such a system more stable while not
increasing the costs of the heating system.
Another option is to construct two digesters connected in series, the first heated, the second
unheated. The first digester can be used as sedimentation tank , in which the substrate is
heated up. The second digester is well isolated to reduce loss of heat.
54